SCOPE OF WORK
KITCHEN REMODEL
Demolition & Preparation
Remove existing kitchen cabinetry, countertops, backsplash, fixtures, and appliances as required.
Remove existing pantry closet.
Remove flooring.
Demo as required for revised kitchen layout and new primary bedroom entry configuration.
Investigate and address water damage at deck door.
Framing / Layout Modifications
Shift primary bedroom entry to access from hallway.
Frame and patch walls/ceilings as required for revised opening locations.
Modify kitchen layout to accommodate relocated island and updated appliance configuration.
Mechanical / Electrical / Plumbing (MEP)
Relocate HVAC components as required for new kitchen layout.
Relocate island plumbing for sink and dishwasher.
Relocate electrical to accommodate new island location.
Adjust ceiling lighting layout to best suit final kitchen design.
Provide electrical for microwave drawer.
Provide electrical and venting for recirculating hood insert.
Install undercabinet lighting.
Relocate family room ceiling fan to be centered on new beam.
New plumbing fixtures as selected.
Flooring:
Replace existing engineered hardwood and tile with LVP flooring throughout main floor except for bedrooms, bedroom closets, and J&J bath.
Reinstall powder bath toilet.
Repair subfloor as required due to demo and water damage at deck door.
Install transitions and nosing as needed.
Cabinetry / Millwork
Install new kitchen cabinetry.
Relocate kitchen island.
Incorporate microwave drawer into island cabinetry.
Install recirculating hood insert within custom cabinet enclosure.
Refrigerator and range to remain in existing location.
Install cabinetry and countertop at eat-in dining area.
Add decorative beam through great room and kitchen center vault.
Countertops / Tile / Finish Surfaces
Install new countertops.
Install backsplash.
Paint walls, ceiling, trim, and patched areas.
Appliances & Final Installation
Install owner-selected appliances.
Final plumbing fixture installation.
Final electrical trim, lighting, and hardware installation.
PRIMARY BATHROOM REMODEL
Demolition & Preparation
Remove existing built-in tub.
Remove existing shower finishes and components.
Remove existing vanity cabinets, countertops, mirrors, and accessories.
Remove tile flooring in bathroom and water closet areas.
Remove existing bathroom exhaust fan.
Retain existing toilet for reinstallation.
Option: Remove existing closet shelving system.
Mechanical / Electrical / Plumbing (MEP)
Shower plumbing locations to remain in existing locations.
Install freestanding tub.
Install plumbing for freestanding tub and deck-mounted tub filler.
Install new faucet fixtures and bath accessories.
Replace bathroom exhaust fan.
Reinstall existing toilet.
Shower / Waterproofing / Tile
Replace shower assembly.
Install tile shower with tile extending to ceiling.
Install shower waterproofing.
Replace front shower wall with full glass enclosure.
Install recessed shower niche on shared closet wall.
Install new tile flooring in bathroom and water closet.
Install tile accent walls to act as fireplace surround, vanity backsplash, and tub surround
Cabinetry / Fixtures / Finish Work
Install two new vanity cabinets and countertops.
Install new mirrors, plumbing fixtures, and accessories.
Paint walls, ceilings, trim, and repaired surfaces.
PROJECT CONSIDERATIONS
Finished basement ceiling below remodeled areas may limit plumbing, HVAC, electrical relocation, or require exploratory work.
Final layout subject to field verification and trade coordination.
Cabinetry field measurements post-framing adjustments required to finalize cabinet order.
KITCHEN
✓ Cabinetry
✓ Hardware
✓ Countertop
⃞ Backsplash
✓ Flooring
⃞ Paint
⃞ Ceiling Beam
✓ Sink
✓ Faucet
✓ Appliances
✓ Hood insert
✓ Undercabinet lighting
⃞ Lighting
paint & Stain
Wall color: TBD
Ceiling color: Standard White
Stair parts Refinish: tBD
Kitchen Cabinetry
Door style: Omega Gilroy, Profile F (med. Bevel shaker)
Full overlay
Perimeter Finish: Maple SW Peppercorn
Island Finish: Match Penhurst Oak Flooring
Hood Design: Chimney
Undercabinet Lighting
Sink
Blanco Siligranit White
No Divider
Beam
349.5" L
Stained to match flooring
BATHROOM
✓ Cabinetry
✓ Hardware
✓ Countertop
✓ Shower tile, grout, and trim profiles
✓ Floor tile and grout
✓ Freestanding tub
✓ Tub filler
✓ Shower trim / valve finishes
✓ Vanity faucets
✓ Lighting
✓ Mirrors
✓ Accessories
✓ Exhaust fan
⃞ Paint
✓ Shower glass
⃞ Closet organization system (if desired)
WALL PAINT
CABINETRY
Door style: Omega Gilroy, Profile F
(med. Bevel shaker)
INSET DOORS AND DRAWERS
Finish: Match PARCHMENT Oak Flooring
exhaust fan
Panasonic whisper
*Provided by Group 5 construction
NEXT STEPS
1. Review your plan.
Take time to review your design proposal. We would love to schedule a call or in-person meeting to review the plan together and walk through ideas for your home.
2. Send us your feedback.
Your design plan includes one revision based on your feedback. Please let us know any areas you’d like us to adjust, refine, or expand upon so we can ensure the plan aligns perfectly with your vision.
3. Bring your plan to life.
Once the initial layout and scope of work are approved, we will begin contacting subcontractors and finalizing material selections to complete project pricing. After pricing is approved, we will place material orders and schedule your project.