SCOPE OF WORK

 

KITCHEN REMODEL

Demolition & Preparation

  • Remove existing kitchen cabinetry, countertops, backsplash, fixtures, and appliances as required.

  • Remove existing pantry closet.

  • Remove flooring.

  • Demo as required for revised kitchen layout and new primary bedroom entry configuration.

  • Investigate and address water damage at deck door.

Framing / Layout Modifications

  • Shift primary bedroom entry to access from hallway.

  • Frame and patch walls/ceilings as required for revised opening locations.

  • Modify kitchen layout to accommodate relocated island and updated appliance configuration.

Mechanical / Electrical / Plumbing (MEP)

  • Relocate HVAC components as required for new kitchen layout.

  • Relocate island plumbing for sink and dishwasher.

  • Relocate electrical to accommodate new island location.

  • Adjust ceiling lighting layout to best suit final kitchen design.

  • Provide electrical for microwave drawer.

  • Provide electrical and venting accommodations for recirculating hood insert.

  • Option: Install undercabinet lighting.

  • New plumbing fixtures as selected.

Cabinetry / Millwork

  • Install new kitchen cabinetry.

  • Relocate kitchen island.

  • Incorporate microwave drawer into island cabinetry.

  • Install recirculating hood insert within custom cabinet enclosure.

  • Refrigerator to remain in existing location.

  • Range and hood to shift slightly to align with revised layout.

  • Install cabinetry and countertop at eat-in dining area.

  • Option: Add decorative beam through great room and kitchen center vault.

Countertops / Tile / Finish Surfaces

  • Install new countertops.

  • Install backsplash.

  • Replace flooring throughout affected areas.

  • Paint walls, ceiling, trim, and patched areas.

Appliances & Final Installation

  • Install owner-selected appliances.

  • Final plumbing fixture installation.

  • Final electrical trim, lighting, and hardware installation.

PRIMARY BATHROOM REMODEL

Demolition & Preparation

  • Remove existing built-in tub.

  • Remove existing shower finishes and components.

  • Remove existing vanity cabinets, countertops, mirrors, and accessories.

  • Remove tile flooring in bathroom and water closet areas.

  • Remove existing bathroom exhaust fan.

  • Option: Remove and replace existing toilet.

  • Option: Remove existing closet shelving system.

Mechanical / Electrical / Plumbing (MEP)

  • Shower plumbing locations to remain in existing locations.

  • Install plumbing for freestanding tub and floor-mounted tub filler.

  • Install new faucet fixtures and bath accessories.

  • Replace bathroom exhaust fan.

  • Option: Install new toilet.

Shower / Waterproofing / Tile

  • Replace shower assembly.

  • Install tile shower with tile extending to ceiling.

  • Install shower waterproofing.

  • Replace front shower wall with full glass enclosure.

  • Install recessed shower niche on shared closet wall.

  • Install new tile flooring in bathroom and water closet.

  • Install tile accent walls to act as fireplace surround, vanity backsplash, and tub surround

Cabinetry / Fixtures / Finish Work

  • Install freestanding tub.

  • Install two new vanity cabinets and countertops.

  • Install new mirrors, plumbing fixtures, and accessories.

  • Paint walls, ceilings, trim, and repaired surfaces.

 

 

PROJECT CONSIDERATIONS

  • Finished basement ceiling below remodeled areas may limit plumbing, HVAC, electrical relocation, or require exploratory work.

  • Vaulted kitchen ceiling may impact lighting layout, HVAC modifications, and hood/cabinet detailing.

  • Final layout subject to field verification and trade coordination.

 

 

SELECTIONS

 
 
 

KITCHEN

⃞ Cabinetry
⃞ Hardware
⃞ Countertop
⃞ Backsplash tile and grout
⃞ Flooring material and transition details
⃞ Paint
⃞ Sink
⃞ Faucet
⃞ Appliances
⃞ Hood insert
⃞ Undercabinet lighting (option)
⃞ Floating shelf
⃞ Lighting

 

BATHROOM

⃞ Cabinetry
⃞ Hardware
⃞ Countertop
⃞ Shower tile, grout, and trim profiles
⃞ Floor tile and grout
⃞ Freestanding tub
⃞ Floor-mounted tub filler
⃞ Shower trim / valve finishes
⃞ Vanity faucets
⃞ Lighting
⃞ Mirrors
⃞ Accessories
⃞ Exhaust fan
⃞ Toilet (if applicable)
⃞ Paint
⃞ Shower glass
⃞ Closet organization system (if desired)

 
 

 
 

NEXT STEPS

1. Review your plan.

Take time to review your design proposal. We would love to schedule a call or in-person meeting to review the plan together and walk through ideas for your home.

2. Send us your feedback.

Your design plan includes one revision based on your feedback. Please let us know any areas you’d like us to adjust, refine, or expand upon so we can ensure the plan aligns perfectly with your vision.

3. Bring your plan to life.

Once the initial layout and scope of work are approved, we will begin contacting subcontractors and finalizing material selections to complete project pricing. After pricing is approved, we will place material orders and schedule your project.