FURNACE ROOM
⃞ Donate/dispose of old window units
⃞ Relocate teacher supplies
⃞ Sort/organize needed HVAC components
LABOR 
⃞ 1 Hour - 2 Organizers
⃞ Volunteer:
     ⃞ (1) Get rid of window units
     ⃞ (Mrs. Blumberg) Categorize teachers supplies
MATERIAL ESTIMATE: $75
LABOR ESTIMATE: $100
ESTIMATED SUBTOTAL: 175
OUTDOOR HVAC STORAGE
⃞ Relocate/Purge Fall Fest items
⃞ Dispose of used filters
⃞ Dispose of old tent components
⃞ Sort and organize cords
⃞ Relocate Nativity to trailer
⃞ Roll and bungee temp fencing
⃞ Clear 36” space from electrical
⃞ Organize lighting, cords, and unused filters on shelving
LABOR
⃞ 4 Hours - 2 Organizers
⃞ Volunteer
     ⃞ (1) Determining electrical cord organization
     ⃞ (4) Heavy lifting/relocating items
MATERIAL ESTIMATE: $50
LABOR ESTIMATE: $400
ESTIMATED SUBTOTAL: $450
GYM STORAGE
⃞ Donate/sell baseball helmets 
⃞ Relocate bags sets to garage
⃞ Sort/organize uniforms and supplies
⃞ Better utilize shelf space
⃞ Label all bins
LABOR
⃞ 3 Hours - 2 Organizers
⃞ Volunteer:
     ⃞ (1) Install hooks 
     ⃞ (2) Relocate items
⃞ (1) Step stool (to aid in accessibility)
MATERIAL ESTIMATE: $425
LABOR ESTIMATE: $300
ESTIMATED SUBTOTAL: $725
*NEW* 30’ x 50’ STORAGE SHED (ONCE CONSTRUCTED)
⃞ Store:
      ⃞ Tables and chairs used in gym for events 
      (relocated from gym lobby and after-care room)
      ⃞ Backup volleyball poles
      ⃞ Stage
      ⃞ Risers
LABOR
⃞ 2 Hours (once constructed)
⃞ Volunteer:
     ⃞ (6) Heavy lifting
MATERIAL ESTIMATE: $0
LABOR ESTIMATE: $200
ESTIMATED SUBTOTAL: $200
PE STORAGE CLOSET
⃞ Categorize equipment into storage bins
⃞ Label all bins
⃞ Better utilize shelf space (relocate small shelf to make room room desk)
     Shelves:
     91w” x 25”d, 98”w x 23”d, 43”w x 19”d, all x ~18” h (shelf clearance) x 4 shelves
LABOR
⃞ 3 hours - 2 Organizers
⃞ Volunteer:
     ⃞ (1) Install hooks 
MATERIAL ESTIMATE: $956
LABOR ESTIMATE: $300
ESTIMATED SUBTOTAL: $1256
TRAILER
⃞ Stack half-round tables
⃞ Add additional/replace shelving
⃞ Purge/edit/sort all items
⃞ Number/Label all bins
⃞ Create content list for each bin
⃞ Create check-out/check-in system to ensure maintenance and accountability
⃞ Relocate/purge robotics items
⃞ Relocate all general-use plates, cups, napkins, utensils, etc. to cafeteria closet
⃞ Determine if Nativity Scene is keep or donate
LABOR
⃞ 12 Hours - 2 Organizers
⃞ Volunteer:
     ⃞ (2) Shelf construction
     Dual-sided storage shelf: Remove existing shelf due to stability concerns.
     Construct a larger 294”w x 52” d (26”d each side) x 20”h (shelf clearance)
     x 3 shelves per side (6 shelves total)
     ⃞ (2) Heavy lifting
     ⃞ (2) Relocating times as needed
MATERIAL ESTIMATE: $1115
LABOR ESTIMATE: $1200
ESTIMATED SUBTOTAL: $2315
GYM LOBBY
⃞ Relocate tables, chairs, stage, and risers to new storage shed
⃞ Dispose of room dividers
ORGANIZING MATERIALS
⃞ System for storing everyday recess and drop-off/pick-up items
⃞ Replace bins if/as needed
LABOR
⃞ Volunteer:
     ⃞ (1-2) Construct bottom-less storage unit with two sets of double doors to store
     drop-off and pick-up cones/carts, recess bins, soccer field marker
ESTIMATED SUBTOTAL: TBD VOLUNTEER/DONATION
SERVER ROOM
⃞ Remove/replace old (bent) shelving as needed
⃞ Serves as storage for electronics and dead records
ORGANIZING MATERIALS
⃞ New shelving (To be determined if needed post-construction)
LABOR
⃞ 2 Hours - 2 Organizers
⃞ Volunteer:
     ⃞ (2) Remove wall mounted shelving
     ⃞ Dispose/Relocate items as deemed necessary post-construction
MATERIAL ESTIMATE: $0
LABOR ESTIMATE: $200
ESTIMATED SUBTOTAL: $200
MAINTENANCE | CLEANING CLOSET (NEAR 3RD GRADE CLASSROOM)
⃞ Sort and organize cleaning supplies
⃞ Sort and organize maintenance supplies
⃞ Dispose of old unused desks and chairs
⃞ Relocate current-style desks (possible trailer w/other classroom tables and chairs)
⃞ Donate or sell cots
⃞ Create storage zone for replacement carpet, tiles, and other currently materials
⃞ Properly label and store current paint - Dispose of old
LABOR
⃞ 3 Hours - 2 Organizers
⃞ Volunteer:
     ⃞ (2) Heavy lifting
     ⃞ (1) Coordinate cot removal
     ⃞ Shirley Albrecht - List of current paint colors and locations.
MATERIAL ESTIMATE: $300
LABOR ESTIMATE: $300
ESTIMATED SUBTOTAL: $600
ROBOTICS CLASSROOM
⃞ Relocate middle school book sets (TBD middle school hallway lockers or 8th grade classroom)
      ⃞ Donate unwanted books
⃞ Move wanted robotics equipment from trailer
⃞ Relocate or donate PSR Videos (post-construction)
⃞ Relocate items as needed (post-construction)
LABOR
⃞ 2 Hours - 2 Organizers
⃞ Volunteer:
     ⃞ Robotics Instructor - Determine needed supplies
     ⃞ Middle School Teachers - Determine needed book sets and best relocation
     ⃞ Eva Duncan - PSR Videos
MATERIAL ESTIMATE: $0
LABOR ESTIMATE: $200
ESTIMATED SUBTOTAL: $200
AUCTION CLOSET
⃞ Relocate graduation gowns to Church Music/Decor Room
⃞ Relocate play costumes (possibly to trailer)
⃞ Relocate Christmas decor (TBD based on whether used for church or school)
⃞ Relocate extra storage shelves from trailer or PE closet for auction items
LABOR
⃞ 2 Hours - 2 Organizers
⃞ 3 sets of 4 Garment bags for graduation gowns and costumes
MATERIAL ESTIMATE: $75
LABOR ESTIMATE: $200
ESTIMATED SUBTOTAL: $275
AFTERCARE CLOSET
⃞ Relocate gym-used table & chairs to New Storage Unit
⃞ Edit and organize games
⃞ Relocate TV cart to cafeteria “lounge”
⃞ Relocate extra church folding chairs from cafeteria
LABOR
⃞ 6 Hours - 2 Organizers
⃞ Volunteer:
     ⃞ (Cheryl Sauer) Editing Games and Toys
     ⃞ (2) Heavy lifting
MATERIAL ESTIMATE: $592
LABOR ESTIMATE: $600
ESTIMATED SUBTOTAL: $1192
CAFETERIA (NON-FOOD) STORAGE ROOM
⃞ Relocate general use plates, napkins, cups, etc. from trailer
     Use existing storage systems
LABOR
⃞ 1 Hour - 2 Organizers
MATERIAL ESTIMATE: $0
LABOR ESTIMATE: $100
ESTIMATED SUBTOTAL: $100
CAFETERIA
⃞  Sell salad bar
⃞  Relocate church folding chairs to Aftercare Closet
FUTURE GOAL - To be determined after further discussion once storage demands are met.
⃞ Set up this “storage” corner as a lounge for use by aftercare, youth groups, and other meeting groups.
⃞ Purchase or seek donation of vinyl or faux leather seating. (studentoutfitters.com has cafeteria-friendly options)
⃞ Upgrade TV cart if desired
LABOR
⃞ 1 Hour - 2 Organizers
MATERIAL ESTIMATE: $0
LABOR ESTIMATE: $100
ESTIMATED SUBTOTAL: $100
CHURCH MUSIC | DECOR ROOM
⃞  Relocate graduation gowns from Auction Closet
⃞  Relocate all church-use greenery to this space.
      - Middle school hall, meeting room, auction closet, etc.
LABOR
⃞ 1 Hour - 2 Organizers
⃞ Volunteer: 
     (Church Decor Lead) Edit and organize greenery as desired.
MATERIAL ESTIMATE: $0
LABOR ESTIMATE: $100
ESTIMATED SUBTOTAL: $100
CHURCH SUPPLY CLOSET
⃞  Sell or donate unused kneelers & podium 
⃞  Relocate kneelers from confessional room
ORGANIZING MATERIALS
⃞  Build Shelving for improved storage
LABOR
⃞ 1 Hour - 2 Organizers
⃞ Volunteer:
     (1) Dispose of unused kneelers & podium
     (1) Construct shelving system
MATERIAL ESTIMATE: $Donation
LABOR ESTIMATE: $100
ESTIMATED SUBTOTAL: $100
CHURCH LOFT
⃞  Keep indoor Nativity figures
⃞  Relocate all Christmas decor currently in open area to Trailer
LABOR
⃞ 1 Hour - 2 Organizers
MATERIAL ESTIMATE: $480
LABOR ESTIMATE: $100
ESTIMATED SUBTOTAL: $580
CRY ROOM
⃞ Edit books
⃞ Get rid of unnecessary bins
⃞ Remove bench
⃞ Create storage for essential personal and baby care items
LABOR
⃞ 1 Hour - 2 Organizers
⃞ Volunteer
    (1) Shelf hanging
    (1) Bench removal
MATERIAL ESTIMATE: $86
LABOR ESTIMATE: $100
ESTIMATED SUBTOTAL: $186
RECTORY STORAGE
⃞  Relocate files to Sever Room, if desired
     A temperature-controlled climate would be a better storage space for files.
⃞  Relocate church Christmas decor to Trailer (keep rectory Christmas decor in place)
⃞  Edit framed pictures
LABOR
⃞ 3 Hours - 2 Organizers
⃞ Volunteer:
    (Father Bob or Decor Lead) Editing pictures and decor
    (Sarah Ray) File determinations
MATERIAL ESTIMATE: $0
LABOR ESTIMATE: $300
ESTIMATED SUBTOTAL: $300
RECTORY GARAGE
⃞  Store all Fall Fest bag sets and needed signage
⃞  Sell or donate unused lawnmowers and equipment
⃞  Relocate soccer liner to future gym lobby storage cabinet closer to fields
⃞  Ensure all gas-powered equipment is stored in this garage
⃞  Sort and organize equipment and supplies
LABOR
⃞  3 Hours
⃞  Volunteer:
      (Joel Noronha, Others?) Determine what equipment and Fall Fest items are needed, Organize disposal of donation of unwanted items
MATERIAL ESTIMATE: $0
LABOR ESTIMATE: $300
ESTIMATED SUBTOTAL: $300
PLANNING FEE - WAIVED AS DONATION: $675
TOTAL MATERIAL ESTIMATE: $4154
TOTAL LABOR ESTIMATE: $5200
ESTIMATED TOTAL: $9354

 
             
             
             
             
             
             
             
             
             
             
             
             
             
             
             
             
             
             
             
             
             
            